Verify the correct installation and condition of fastening systems with technical evidence.

The Challenge

Installation Deviations Appearing During Campaign

Incorrect installation or control based solely on torque can leave fastening deviations that appear during the campaign and create operational risk.

The Solution

Expert Verification with Technical Evidence

Specialized service that reviews protocols, installation, and condition of bolts and fastening elements. It can be complemented with real tension measurements to identify deviations and define corrective actions.

Benefits

Experience and Objective Measurement

Experience and Objective Measurement

Combines Field Support experience with objective tension measurement when applicable, focusing on installation, procedures, and corrective actions.

External Control

External Control

Mitigates uncertainty regarding bolt installation control under the expert eyes of engineers dedicated to bolted joints.

Fewer Deviations

Fewer Deviations

Reduces deviations, slack, and bolt shear risk.

Evidence for the Campaign

Evidence for the Campaign

Provides evidence to ensure the campaign and improve procedures.

How Does the Solution Work?

How Does the Solution Work?

Click to enlarge

Transforming Operational Data into Actionable Information

Can leverage existing cameras, features end-to-end coverage and automatic classification, consists of a platform with traceability, and applies in multiple process stages.
Captured Information
01
Procedure Compliance
02
Installation Findings
03
Deviations
04
Tension Measurements
05
Corrective Actions
06
Campaign Monitoring
Processing
Technical Review and On-site Verification
Results
01
Audit Report
02
Findings
03
Risks
04
Recommendations
05
Corrective Action Plan
Continuous Model Improvement
Captured Information
01
Procedure Compliance
02
Installation Findings
03
Deviations
04
Tension Measurements
05
Corrective Actions
06
Campaign Monitoring
Processing
Technical Review and On-site Verification
Results
01
Audit Report
02
Findings
03
Risks
04
Recommendations
05
Corrective Action Plan
Continuous Model Improvement

Where Does the Solution Apply?

Installation of SAG and Ball Mill Liners

Critical Bolted Joints

Work Executed by Third Parties

All Digital Solutions solutions

17 solutions available

Have Questions?

Our experts are available to help you find the right answer. Contact us, and we'll respond as soon as possible.

Whistleblower Channel
If you are aware of conduct that goes against our Code of Ethics, you can report it through this channel.
Make a report